real time web analytics

Choose one

or multiple languages


0,1,1
  • German
  • English
  • Chinese
  • Spanish

contract (v)


Agreed deviations are to be documented as changes to the contract.

This elongations a right angles to the direction of traction is called lateral contraction.

The Contractor shall draw up and supply a measurement report for test equipment.

verengen (v)

收缩 (v)

狭窄的 (v)

estrechar (v)

Further search


item


Discover innovative solutions
for machine building and automation.

Go to the website