Choose one
or multiple languages
The Contractor shall draw up and supply a measurement report for test equipment.
The final stage in production, when the end-product is manufactured, reports its requirements to the upstream production stage.
A structural analysis and fire inspection and environmental reports are also necessary for most construction projects.